Flat Handover Checklist: A Room-by-Room Snag List and the Papers to Collect

Published Verified 10 min read IamHere Research Desk

Bathroom render from the Sri Aditya Vantage brochure, Narsingi, Hyderabad
Image: Sri Aditya Homes brochure (developer render)

A flat handover checklist has 2 halves: a room-by-room snag list and a set of papers. Walk every room with a tape, a spirit level and a torch. Log each defect with a photo. Then collect 8 key papers, led by the occupancy certificate. Under Section 14(3) of the RERA Act, 2016, the builder must fix defects you report within 5 years, in 30 days each.

1. Your rights at handover under the RERA Act

Know the law before you walk in. Four sections of the RERA Act, 2016 shape handover day.

SectionWhat it saysWhat it means for you
19(10)Take physical possession within 2 months of the OCPlan your move once the OC arrives
14(3)Builder fixes defects you report within 5 years of possession, within 30 days, freeYour snag rights do not end at handover
17Conveyance deed within 3 months of the OC, where no local law sets a timePush for the registered deed on time
11(4)(d)Builder runs essential services at fair charges until the owners’ association takes overAsk who manages the site in year 1

The 5-year window is your safety net. But the first walk-through still matters most. A defect you log on day 1 is hard for anyone to dispute.

For how RERA tracks a project before handover, see our Telangana RERA check guide. For the Vantage dates, read our possession guide.

2. What to bring on inspection day

Book a 3 to 4 hour slot in daylight. Large homes take time. A 6,546 sq ft 4 BHK has many more points to test than a 2 BHK.

Bring these 10 items:

  1. A 5 m measuring tape
  2. A spirit level, or a level app on your phone
  3. A torch for ducts and corners
  4. A phone charger to test each socket
  5. A small ball or marble to test floor slope
  6. A bucket for a water test on balconies
  7. Masking tape to mark defects on the wall
  8. The unit plan and the specifications sheet
  9. A notebook, with rooms listed in order
  10. A friend to note while you test

Take a photo of each defect with the masking tape mark in view. Name each photo by room and number, such as “Kitchen-04”. A list of 40 named photos is far easier to track than 40 loose ones.

3. The snag list, room by room

Go room by room in 1 fixed order. Start at the main door and end at the balconies. In each of the 10 areas below, test each item, then tick it or log it.

RoomWhat to checkHow to test
Main and service doorsFrame, lock, hinges, gap at the floorOpen and shut 5 times; check the latch
Living and diningWall finish, ceiling, skirting, switchesShine a torch along walls for waves and cracks
KitchenHob and chimney points, sink, taps, slope to drainRun water 2 minutes; check under the sink
BedroomsWardrobe space, windows, sockets, AC pointsTest every socket with a charger
BathroomsSlope to drain, taps, flush, grout, leaksFill the floor with water; watch where it goes
BalconiesRailing height and fix, slope, drainPour a bucket of water; check for pooling
WindowsFrames, glass, handles, sealsClose and look for light gaps at the edges
FloorsHollow tiles, chips, levelTap tiles with a coin; roll a ball
ElectricalDB labels, MCBs, earthing, meterSwitch each MCB off and on
Utility and ductsWater meter, gas point, drain accessCheck for damp near shafts

The 3 tests that catch the most

First, tap every floor tile with a coin. A hollow sound means a weak bond below, and that tile may crack within 1 or 2 years. Second, flood each bathroom and balcony floor. Water should reach the drain in under 1 minute, with no pools left behind. Third, test every socket in each of the 4 or 5 bedrooms with a phone charger.

Walls, ceilings and paint

Hold a torch flat against each wall. Light at a low angle shows waves, patches and fine cracks. Hairline cracks under 1 mm are common in new plaster, but log them anyway. Check the ceiling above each bathroom for damp spots, since that points to a leak from the floor above.

Doors and windows

Open and close each door 5 times. It should swing freely and latch at the first push. Check the gap at the floor, which should be even along its full width. For the 2 Vantage entries, test both the main door and the service door.

On each window, slide the panel from end to end. Look for light at the edges once it is shut. On a high floor in the Kokapet–Narsingi belt, wind can push rain through a poor seal. So pour a cup of water along the outer track and watch the inner sill.

Plumbing and wet areas

Run every tap for 2 minutes, hot and cold. Look under each sink for drips. Flush each toilet 3 times and listen for a running cistern. Check that the floor trap has a grille and that no smell comes up from it.

Electrical and meters

Open the distribution board and check that each of the MCBs has a label. Switch them off and on, one at a time, and note which room goes dark. A 6,546 sq ft home has many circuits, so a clear label saves hours later. Test each AC point and geyser point too, since those carry the heaviest loads in a Hyderabad summer. Ask for an earthing test report, and check that the meter shows your unit number.

Balconies and railings

Vantage balconies run all around the home, 5 ft to 12 ft 6 in deep. Push firmly on each railing at 3 or 4 points. It should not flex. Pour a bucket of water on each deck and watch it run to the drain. Standing water after 10 minutes means the slope is wrong.

Check the sill where each deck meets the room. Water should not creep under the door frame. On the double-height decks, look up at the ceiling for stains from the floor above.

4. Checks linked to Vantage specifications## 4. Checks linked to Vantage specifications

For a Sri Aditya Vantage home, match the snag list to the brochure specifications. Our specifications guide explains each of the 9 items below.

Spec in the brochureWhat to check at handover
Aluminium windows, provision for mosquito meshSmooth slide, tight seal, mesh tracks in place
Kitchen: hob and chimney points, modular kitchen provisionPoints where the plan shows them; gas line capped
3-phase power, pre-paid metersMeter live, balance shown, 3 phases in the DB
100% DG backup with AMF panelAsk for a live power-cut test
Water softening plant, meter per homeMeter reads; soft water at the taps
Central gas bank, pre-paid metersGas meter fitted and sealed
Intercom and panic button in liftsPress both and confirm a reply
NBC fire hydrants, sprinklers, alarmsSprinkler heads clean and uncovered
Balconies 5 ft to 12 ft 6 in deepDepth matches the plan; railing fixed

The brochure lists a provision for a modular kitchen, not a fitted one. So do not log a missing kitchen as a snag. Log only the points and lines the Vantage specs promise.

Also check your area against the agreement. Carpet at Vantage is about 75% of saleable. Measure the rooms and compare with the carpet area in your agreement. Our carpet vs super built-up guide shows how.

5. The 8 papers to collect

The snag list protects the home. The papers protect your title. Collect all 8 before or on the day you sign the possession letter.

#DocumentWhy it matters
1Occupancy certificate (OC)The local body has cleared the building to live in
2Possession letterFixes your possession date, which starts the 5-year defect window
3Paid-up receipts and no-dues letterProof you owe nothing more
4Registered sale or conveyance deedYour title; stamp duty paid at registration
5Allotted parking letterBay number in writing
6Warranty cards and manualsFittings, fixtures and any appliances
7As-built plan of your unitShows ducts, wiring and pipe runs
8Society and maintenance papersRules, rates, corpus receipt

Do not accept possession without the OC. Without it, the home is not cleared to live in, and banks may hold back the last loan payment. Our documents checklist covers the full title set for Hyderabad.

You pay stamp duty when you register the deed. In Telangana, stamp, transfer and registration total 7.5%. Our stamp duty guide has worked examples. If you have a loan, the bank will want the original deed too. See our home loan guide for how the last of the 3 or 4 payouts works.

6. How to log snags and get them fixed

A list only helps if it leads to repairs. Follow these 5 steps.

  1. Number every snag. Use a sheet with 4 columns: room, item, photo name and date.
  2. Send it in writing. Send a signed letter or email to Sri Aditya Homes, with photos, and keep a copy.
  3. Get a fix date. Ask for a date for each of the items, and 1 named person to follow up with.
  4. Re-inspect. Walk the home a 2nd time once the team says the fixes are done.
  5. Sign with notes. If items remain on day 2, write them on the possession letter before you sign.

Section 14(3) gives the builder 30 days to fix a defect you report. That clock runs for 5 years from possession. Keep every email. If fixes stall, you can file a complaint with Telangana RERA.

7. Common areas and the society handover

Your home sits inside a larger site. At a project like Vantage, that means 9 towers, a 1,00,000 sq ft club and 3.5 acres of amenities.

Check the common areas you use each day. Test the V3F lifts from the podium to your floor, and press the intercom and panic button in the car. Look at the EV parking floor and your allotted bay. Walk the lobby and the NBC fire exits on your floor. Note any snags in writing, just as you did inside the home.

Section 17 of the RERA Act says the builder must hand the common areas and key plans to the owners’ association. Under Section 11(4)(d), the builder runs the site at fair charges until then. Ask for the date of the first general body meeting. Also ask in which month the corpus fund moves to the association. Our maintenance charges guide explains the corpus and the monthly bill.

8. The handover checklist on one page

Here is the full list in 5 rows.

StageKey checks
Before the dayOC issued, RERA dates checked, dues cleared, 3 to 4 hour slot booked
Inside the home10 rooms and systems, tile tap test, water test, socket test
SpecsWindows, kitchen points, meters, backup, gas, fire safety
Papers8 documents, led by the OC and the possession letter
After the daySnag sheet sent, fix dates set, re-inspection, notes on the letter

Handover for Vantage is some way off. RERA completion is reported for August 2028. But the checks start at booking. Our site visit checklist covers what to confirm now, and the specifications set the standard you will test against later.

Want the Vantage specifications sheet and RERA dates in one pack? Ask for the buyer pack.

Frequently asked questions

It should cover a room-by-room snag list and the key papers. Those include the occupancy certificate, possession letter, paid-up receipts and the society handover documents.

Under Section 14(3) of the RERA Act, 2016, the builder must fix defects you report within 5 years of possession. The fix is due within 30 days, at no cost to you.

Section 19(10) of the RERA Act says the buyer must take physical possession within 2 months of the occupancy certificate.

No. The OC shows the local body has cleared the building to live in. Ask to see it before you sign the possession letter.

Plan on 3 to 4 hours for a large 4 BHK. Take a tape, a spirit level, a torch, a phone charger for socket tests and a notebook.

Private preview

Get the Sri Aditya Vantage cost sheet & floor plans

We send the official brochure, floor plans and cost sheet, and help you plan a site visit.

Send me the details

Official cost sheet, floor plans and a private site-visit slot.

Request received

Thank you — we'll reach out shortly with the details.

Get Price & Brochure
Sri Aditya Vantage
Get Price & Brochure